Send a note to the bench
Workshop details
Business hours
- Monday to Thursday8:00 to 17:00
- Friday8:00 to 15:00
- SaturdayTether evenings by booking
- SundayClosed
Questions the bench desk hears most
We schedule bench weeks in a rolling four week window, and a full envelope programme usually takes three of those weeks. Reach out early with the build sheet and the sensor list, and the bench desk will map the stations against your dates. Valve weeks and ballast days are the busiest stations, so a note sent before the envelope is finished gives us the most room to place your run.
Yes. We write the logging and sampling software against the specific hardware in the workshop, and that includes client supplied pressure taps, load cells and thermocouples. The scoping visit is where we confirm the signal ranges and the sampling rate, and where we decide whether any existing sensor needs a calibration pass before it joins the shared bench clock.
You receive a release folder that binds the float bay log, the wind lane round notes, the valve tolerance card, the ballast weigh sheet, the burner chart and the signed tether record into one traceable set. Every sheet in the folder refers back to the intake figures taken at the float bay desk, so the whole set reads as a single thread from fabric to tether.