Station One
Float Bay Desk
The float bay desk is the intake station for every envelope that enters the workshop at 155 W 800 N, Logan - 84321-3215, United States (US). We start by reconciling the fabric against the build sheet: gore count, seam pattern, panel width and total fabric mass. Each figure is recorded on a float bay log, and any difference between what the build sheet claims and what the fabric actually measures is written down before inflation begins.
Once the fabric is reconciled, we weigh the gas cylinders and check their tags against the delivery note, so the lift estimate is built from real weights rather than nominal ones. The desk then produces a lift plan that states the target gross lift, the allowed trim band and the maximum pressure the canopy may see during the first inflation. A clean float bay sheet gates the envelope into the wind lane, and an envelope with an unresolved discrepancy never leaves the desk.
The desk is run by a bench lead who stays with the envelope through the whole cycle, which means the person who wrote the intake figures is also the person who signs the tether record weeks later. That continuity is deliberate. It removes the handoff gaps where a misread figure could survive unnoticed.
Station Two
Wind Lane Rounds
Wind lane rounds move the inflated canopy through a drafting corridor lined with pressure taps. We run four or more rounds per lane at stepped fan speeds, and every tap sample is stamped with its round number by our in house control software. The goal is a pressure map that shows how the envelope sheds crosswind load across its gores, from the crown down to the skirt.
Each round produces a round note written by the operator on duty. The note records the ambient temperature, the fan setting, the tap drift observed during the pass and any visual change in the canopy shape. We never average the raw samples away at this stage, because a short spike that explains a later seam concern must survive the first read intact.
At the end of a wind lane week the client receives the raw sample set, the round notes and a short summary of the pressure bands observed. If the envelope shows a band that sits outside its lift plan, we hold it at the corridor and rebuild the affected gore before it moves to the valve cell.
Station Three
Valve Weeks
Valve weeks are dedicated entirely to the relief and dump valves that protect an envelope from over-pressurising. We cycle each valve against a calibrated reference rig through a full temperature sweep, recording crack pressure and reseat pressure at every step. A valve that drifts outside its band is stripped, rebuilt and swept again until it holds.
The output of a valve week is a labelled valve set and a tolerance card. The tolerance card lists, in large figures, the crack and reseat bands for each valve at cold, ambient and warm conditions, so the flight crew can check a valve in the field without consulting a manual. We write these cards to be read under poor light by tired hands, which shapes every type choice and every margin on the page.
Valve weeks interleave with ballast days because both stations depend on the same temperature log. A cold morning valve sweep can then be compared directly with a cold morning ballast drop, and the two records share a common clock that the crew can read side by side.
Station Four
Ballast Days
Ballast days test the sand sacks and release lines that give a pilot trim authority. We weigh every sack on a certified balance and record the figure on a weigh sheet, then hang the release ring on our bench gantry and time the drop sequence across repeated pulls. The aim is a ballast set that behaves identically in a cold morning shed and at altitude.
Release timing is measured, not estimated. The gantry carries a simple mechanical timer that the operator resets before each pull, and every drop is written down with its pull number and its measured release interval. Any sack whose release line drags or sticks is pulled from the set and re-rigged before the day closes.
By the end of a ballast day the client holds a weigh sheet with every sack numbered and weighed, plus a drop table that states the expected release interval for the full set. That table is the document the crew uses when it decides how much ballast to load for a given morning.
Station Five
Burner Check Sessions
Burner check sessions measure the burner that turns fuel into climb. We log each burner through warm-up, cruise and cold shutdown on a load cell rig, capturing flame stability, fuel draw and heat output at each phase. Any pressure sag that could turn a smooth climb into a lurch is captured as a written note and a chart the crew can read at a glance.
Sessions run after the envelope work rather than before it, because the heat of a burner would distort the pressure readings taken in the wind lane. That ordering is a rule on our bench, not a preference. A burner that leaves its session with a stable warm-up, a flat cruise and a clean shutdown earns its rebuilt fuel line spec and moves to the tether evening.
Each session closes with a burner chart folded into the envelope file. The chart shows warm-up, cruise and shutdown as three labelled phases, with the fuel draw marked at the start and end of each phase, so a crew can see in a single read whether a burner is behaving the way it did on the bench.
Station Six
Tether Run Evenings
Tether run evenings prove the whole stack together. The envelope is tied to our ground ring, the burner is lit, ballast is loaded and the integrated control software records the entire run as one timeline. Every input the crew touches and every sensor that answers is stamped on that timeline, so a later reader can replay the evening in sequence.
We finish each evening with a signed tether record. The record states the envelope identifier, the valve set and tolerance card in use, the ballast set and drop table in use, and the burner chart that closed the previous session. It is the single document that ties every earlier station together, and it is the document a crew takes into the field.
Because the tether evening runs the full stack, it is also where we catch integration faults that no single station would surface. A valve that cracks correctly on the rig but lags under burner heat, or a ballast line that releases cleanly on the gantry but drags in a real basket, will show up here. When it does, we hold the record open until the fault is resolved and the evening is re-run.